Appalachian Development Highway System

(Appalachian Corridors)
CFDA 23.003 Active Project Grants
No open Grants.gov opportunities under this program right now. Browse all APPALACHIAN REGIONAL COMMISSION programs →

Program Funding

Annual program obligations reported to SAM.gov.

Latest annual funding
$271.2M FY2016
$271.2M
FY16

Funded Projects

Examples of what this program has supported.

FY2016 Open 25 miles of ADHS to traffic 10.9 miles completed

Program Objective

To provide a highway system which, in conjunction with other federally-aided highways, will open up areas with development potential within Appalachia where commerce and communication have been inhibited by lack of adequate access.

Eligibility

Eligible Applicants

  • State governments

State governments only are eligible for development highways within their Appalachian portions.

Beneficiaries

  • 19

States

How to Apply

Application Procedure

The ARC has established a corridor system. The Appalachian State office designated by the State Member submits an application for construction within this system to the Commission for consideration. ARC must concur in detailed highway locations and construction centerlines. Upon such approval, State highway departments may submit plans to implement projects to the State-level office of Federal Highway Administration.

Award Procedure

Upon determination that the State approved project is eligible within a Commission approved Appalachian Highway Plan, the Federal Co-chairman notifies FHWA of centerline approval after determining that the project satisfies all Federal requirements. The Department of Transportation is then notified, administers the grants and disburses the funds.

Program details & compliance

Use of Funds

Allowed Uses

The grants may be used for preliminary engineering, right-of-way, and construction of highways meeting the objectives stated above. Total highway construction may not exceed 3,090 miles for the 13-State system. The highways must be accepted and maintained as a Federal-aid highway. Refer to general use restrictions stated in the Appalachian Regional Development program (23.001).

Required Documentation

Segments must be approved by the ARC and projects must be processed in accordance with State Highway department and Federal Highway Administration procedures.

Matching Requirements

Funding for work on the Appalachian Development Highway System is allowed at 100%, wherever the project is located. Please see the ARC Code for more details.

Reporting & Compliance

Audit Required
Yes

Applicable 2 CFR 200 Subparts

  • Subpart B — General Provisions
  • Subpart C — Pre-Federal Award Requirements
  • Subpart D — Post-Federal Award Requirements
  • Subpart E — Cost Principles
  • Subpart F — Audit Requirements

Contacts

Jill Wilmoth
202-884-7668
1666 Connecticut Ave NW Suite 600, Washington, DC 20009
Data from SAM.gov Federal Assistance Listings. Source published: 2017-09-17. Spec v1.0. Last synced: 2026-06-02 02:46:31.